Swiftech H20 220 APEX ULTIMA Manual do Utilizador Página 1

Consulte online ou descarregue Manual do Utilizador para Acessórios para Computador Swiftech H20 220 APEX ULTIMA. Swiftech H20 220 APEX ULTIMA User Manual [en] Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 17
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Copyright Swiftech 2008 – All rights reserved – Last revision date: 10-29-08- Information subject to change without notice – URL: http://www.swiftech.com
Rouchon Industries, Inc., dba Swiftech – 3700 Industry Avenue, Suite 104, CA 90712 – Tel. 562-595-8009 – Fax 562-595-8769 - E Mail: [email protected]
1 of 17
These instructions are updated on a regular basis. Please visit our web site at www.swiftech.com
Vista de página 0
1 2 3 4 5 6 ... 16 17

Resumo do Conteúdo

Página 1 - 1 of 17

Copyright Swiftech 2008 – All rights reserved – Last revision date: 10-29-08- Information subject to change without notice – URL: http://www.swift

Página 2 - Packing List

Figure 8 Figure 9 Figure 7 Fasten the hold-down plate assembly to the Apogee™ GTZ water-block Peel-off the protective paper from all four foam st

Página 3 - 3 of 17

4. PUMP INSTALLATIONGeneral Use  The MCP655-B pump is a magnetically driven centrifugal pump featuring a 12 V DC motor. It requires no maintenance

Página 4 - I. Planning

Permanent installation to the chassis, and exploded view Nominal voltage / Connector 12 V DC / Molex 4 pin Maximum pressure 50 PSI (3.5 BAR) Op

Página 5

Figure 1 Port Usage definition Upper side port: “Inlet” as shown in figure 1 is the return line from the system Lower side port: “Outlet (to pump)” s

Página 6 - RADIATOR INSTALLATION

ITEM NO. PART NUMBER DESCRIPTION QTY.1 BCKT1 "L" bracket 12 BCKT2 "U" bracket 2390272A146-6-32x3-8-philips34 91772A158-6-32X1.756-

Página 7

6. INSTALLING THE TUBING Gather the Smartcoils towards the center of the tubing, and then pull on the ends of the tubing. This will allow the coils

Página 8

• Prior to fill-up the circuit, you will need to re-install your power-supply in order to start-up the pump during the fill procedure. You must be ab

Página 9

8. TROUBLESHOOTING  Air keeps circulating into the circuit, long after the pump has primed: o There is a significant pocket of air trapped into

Página 10 - E-INSTALLING THE MOTHERBOARD

Packing List QTY ITEM 1 APOGEE GTZ water-block, including socket 775 and socket 1366 hold-down plates for Intel Core® (Core 2, Duo, Quad, Extreme,

Página 11 - UMP INSTALLATION

TTAABBLLEE OOFF CCOONNTTEENNTTSS I. PLANNING...

Página 12 - ICRO RESERVOIR INSTALLATION

INTRODUCTION Congratulations on your purchase of a Swiftech™ H20-APEX liquid cooling system! This kit has been designed to facilitate the installati

Página 13 - Installation

 From a performance standpoint there is very little performance to be gained from strictly controlling the component sequence: the maximum delta T (

Página 14 - Bracketry installation and

1. MCR220 RADIATOR INSTALLATION Preamble: The MCR220™ dual 120mm radiator ships with the fans and the Radbox chassis already pre-assembled to the rad

Página 15 - NSTALLING THE TUBING

 Installation  Place the radiator assembly on the back of the computer to roughly estimate where it will fit best.  You need to consider the fol

Página 16 - Filling-up the circuit

 Remove the radiator assembly from the back-plate and mark the center of the circle.  Two rubber grommets are provided with your kit so that yo

Página 17 - PTIONAL COMPONENTS

3. Fasten the block to the motherboard 4. Install the tubing For optimal performance, it is critical to orient the water-block properly relative to

Comentários a estes Manuais

Sem comentários